Bring targeted heat to potash recovery.
Plasmera is developing a mobile unit designed to supply heat for site-specific potash solution mining, where heated water circulated through a deposit dissolves potash and returns it to the surface as brine.
- Format
- Mobile unit
- Stage
- In development
- Role
- Heat input to circulation
- Still needed
- Water and surface processing
Intended audience
This page is for teams considering solution mining where heat supply is part of the design.
- Potash operators
- Project developers evaluating solution-mining sites
- Teams with deposits or cavities suited to heated-water circulation
Heat is a design input, not an afterthought
In solution mining, water is circulated into a potash bed, dissolves mineral, and returns as brine for drying. How much heat a project needs, and how it is delivered, depends on the deposit, the water and the circulation design. Plasmera's concept is a mobile heat unit that could be assigned to one deposit area and later to another.
- Potential to add controlled heat to circulation at a specific site, to be quantified in an evaluation
- A mobile format intended to limit permanent equipment at each location, subject to site requirements
- Solution mining still requires a water supply, brine handling and surface processing. The concept addresses heat input only
The application at a glance
Heat, circulation, dissolution and brine recovery

Conceptual schematic. Brine circulates down the well, dissolves potash in the bed and returns as potash solution for evaporation at the surface.

Potassium, the recovered granule, and its end use as agricultural fertilizer.
What an evaluation would examine
A project evaluation would look at how heat fits a specific deposit and its existing operation.
Deposit characteristics
Depth, thickness, grade, geology and any prior cavity or cycle history.
Water chemistry
Water source, composition and handling, and how it behaves when heated.
Circulation needs
Flow rates, pressures and how cavity development is managed.
Heat demand
How much heat the circulation requires, and on what schedule.
Existing processing infrastructure
Brine handling, drying or evaporation capacity, power and site access.
Where this stands today
Plasmera is developing its magnetic plasma pinch technology with Battelle Memorial Institute, which co-developed the pinch mechanism. A 2010 Battelle assessment, as summarized by Plasmera, concluded that the magnetic pinch significantly increases plasma temperature and length, creating a larger reaction zone. Torch testing was recorded in 2021. Remaining work includes plume testing and data collection, final design, and building the first system. Application performance described on this page has not yet been demonstrated at customer scale.
Evidence for this application
- A potash mine operator has signed a letter of intent (LOI) covering one mobile unit for potash extraction.
- An LOI is not a binding customer contract, an operating deployment or booked revenue.
- No solution-mining results from a Plasmera unit are published on this page.
Frequently asked
What would the Plasmera unit contribute to a solution-mining operation?
The proposed contribution is heat delivered to the circulating water. Wells, water supply, brine handling and surface processing remain part of the operator's design.
Does heating remove the need for water or surface processing?
No. Solution mining depends on water and on processing recovered brine. The concept addresses heat input and does not replace those requirements.
How much heat would a project need?
It depends on the deposit, circulation rates and water chemistry. Quantifying heat demand is one of the first topics in an evaluation.
Which deposits could this suit?
Suitability is site-specific and is not assumed in advance. Deposit characteristics, water and existing infrastructure would be reviewed together.
Evaluating a potash site?
Tell us about the deposit and your current process. A founder will reply directly.
